TDOT Lane Closures Scheduled For I65 & US 431

TDOT Lane Closures Scheduled For I65 & US 431

TDOT Lane Closures Scheduled For I65 & US 431

ROBERTSON COUNTY TENNESSEE: (Smokey Barn News) – TDOT is currently working on two projects involving Fog Sealing under the Enhanced Maintenance Plan, which was created to extend the life of specific roads until they can be fully resurfaced next year. There are also additional projects for grading and drainage along with cutting and trimming for I65 and US 431 in Robertson County.

FOG SEALING:

The first job is Fog Sealing on I-40 in Cheatham County which will be narrowed to One Lane. The second job is in Robertson County on I-65 and will be conducted following the completion of I-40.

GRADING DRAINAGE – I65 Robertson Co.

Grading, drainage, construction of bridges and retaining walls, ITS and paving ar scheduled Nightly, 8 p.m. – 4 a.m., There will be temporary lane closures on I-65 NB and SB for roadway and traffic control maintenance. One lane will remain open at all times.

RESURFACING – US 431 (THRU 10/12)

The resurfacing on U.S. 431 (S.R. 65) from South of Gifford Place to the Robertson County line, including concrete overlayed bridge deck repair and thin epoxy overlay

· 10/6 – 10/12, 9 A.M., 3 P.M., There will be lane closures in various locations for Bridge deck and epoxy.

CUTTING & TRIMMING -10/8

Cutting and trimming vegetation off of Roadway Signs

· 10/8, 6 a.m. – 11 a.m., Lane closures for Cutting and trimming vegetation off of Roadway Signs at MM 108 – 109

Mobile: To See The Latest Stories or to share this article, scroll below

Clicky